Strip Miner I

Strip Miner I
Strip Miner I A bulk ore extractor designed for use on Mining Barges and Exhumers.
Capacitor
activation cost activation cost
90 GJ
Structure
Structure Hitpoints Structure Hitpoints
40 HP
Volume Volume
100 m3
Fitting
powergrid usage powergrid usage
10 MW
CPU usage CPU usage
60 tf
Can be fitted to Can be fitted to
Exhumer
Targeting
Optimal Range Optimal Range
15 km
Miscellaneous
Activation time / duration Activation time / duration
180000 s
Mining amount Mining amount
540 m3
Tech Level Tech Level
1
Blueprint
Strip Miner I Blueprint i Strip Miner I Blueprint
Required skills
Primary Skill required
Mining Mining IV
Material Requirements
Skill / Industry
Industry Industry
1
Material / Mineral
Tritanium Tritanium
24,417
Pyerite Pyerite
18,941
Mexallon Mexallon
7,728
Nocxium Nocxium
1,338
Megacyte Megacyte
262
Waste
? Waste Factor
10%
Variations
Tech I
i Strip Miner I
Tech II
i Modulated Deep Core Strip Miner II
i Modulated Strip Miner II
Faction
i ORE Strip Miner
The details above have been created by our wiki robot.
No one has added to this database item yet.
Please feel free to edit this page and add extra information to this article.
Thank you!