Mining Foreman Link - Laser Optimization

Mining Foreman Link - Laser Optimization
Mining Foreman Link - Laser Optimization Decreases mining lasers/ gas harvester and ice harvester duration.

Foreman Links are dedicated mining operation systems designed to assist foremen in coordinating their operations.
While only one of these units can normally be operated at any given time, certain advanced units allow the use of multiple systems.

Note: The Fleet bonus only works if you are the assigned fleet booster.
Capacitor
activation cost activation cost
25 GJ
Structure
Structure Hitpoints Structure Hitpoints
40 HP
Volume Volume
60 m3
Fitting
powergrid usage powergrid usage
200 MW
CPU usage CPU usage
5,000 tf
Miscellaneous
Activation time / duration Activation time / duration
10000 s
Tech Level Tech Level
1
Command Bonus Command Bonus
-2 %
Blueprint
Mining Foreman Link - Laser Optimization Blueprint i Mining Foreman Link - Laser Optimization Blueprint
Required skills
Primary Skill required
Leadership Leadership V
Secondary Skill required
Mining Director Mining Director I
LeadershipLeadership I
Mining ForemanMining Foreman V
LeadershipLeadership I
Material Requirements
Skill / Industry
Industry Industry
1
Material / Mineral
Tritanium Tritanium
897
Isogen Isogen
105
Nocxium Nocxium
53
Megacyte Megacyte
11
Material / Composite
Nanotransistors Nanotransistors
21
Hypersynaptic Fibers Hypersynaptic Fibers
11
Waste
? Waste Factor
5%
The details above have been created by our wiki robot.
No one has added to this database item yet.
Please feel free to edit this page and add extra information to this article.
Thank you!