Skill at efficiently using factories. 4% reduction per skill level to the material requirements needed for production.
Miscellaneous
Primary attribute Memory
Secondary attribute Intelligence
Training time multiplier 3 x
Manufacture Cost Bonus -4 %
Structure
Volume 0.01 m3
Required skills
Primary Skill required
Industry III
This item database entry is a stub. If you have additional information about this entry, you can help Evelopedia by expanding it with more content and relevant information.
Item Database Stubs