Skill at installing power upgrades e.g. capacitor battery and power diagnostic units. 5% reduction in CPU needs of modules requiring Energy Grid Upgrades per skill level.
Miscellaneous
Primary attribute Intelligence
Secondary attribute Memory
Training time multiplier 2 x
CPU Need Bonus -5 %
Structure
Volume 0.01 m3
Required skills
Primary Skill required
Engineering II
Secondary Skill required
Science I
This item database entry is a stub. If you have additional information about this entry, you can help Evelopedia by expanding it with more content and relevant information.
Item Database Stubs